University of Arizona ENR2

Project Highlights
- 151,000 Sq Ft
- 5 Story Building plus Rooftop “Ecopod”
- Distech Lonworks Control System with Niagara Integration. Integration of Lighting Controls, Electrical Metering and Hydronic BTU Metering.
- Steam/Hot Water Plant, 4 VAV Air Handling Units, 26 Fan Coil Units, 79 VAV Boxes & 96 Chilled Beam Zones.